What's new

New Islamabad Airport Progress

31945980_2013472358694352_5134491883195596800_n.jpg


31936650_1001530553342587_8914038145620639744_n.jpg




31949984_1001530523342590_2560983733251342336_n.jpg




31956080_2013472112027710_1097719471067365376_n.jpg




Central Masjid Of Islamabad Airport Latest Pics

31898257_802998829893845_8895564245740027904_n.jpg


31946891_802998499893878_5664276313905561600_n.jpg
 
The disaster that is Islamabad airport start

everything should be automated listed on boards..there should NOT be any spoon feeding..
if they cant read they should be patient (like they are in arab airports) rather than complain..

regarding flight delays..why is it happening?..is it an airline problem or an airport problem?

complaints that it took an hour to come to airport is big "bullshit" so what if it takes an hour did she saw the map??..it takes me 2 hour to get to newyork airport
 
Airport and Airline operations in full swing at Islamabad International Airport

32202768_1498958430231850_8616881873945100288_o.jpg
 
imarshad


On Saturday I visited the Airport with my family. I guess it was before the security alert as there wasn't much red alert there. Anyways here are a few points that i noted.
1) You have to pay toll at three different places. Rs. 30 near the Top City area on the way towards the airport as well as on the way back. Rs. 90 in the parking area. So per visit one needs to pay Rs. 150 per vehicle.
2) The airport building and surrounding area ls huge. The parking area is not as big as it should be. It suffices for now but in next 2-3 years when the air traffic increases I think it will not be enough.
3) The visitors gallery is a big disappointment. Nothing there so far. Only 3-4 shops and nothing else. No area/window/gallery to watch the airplanes.
4) The only place to watch airplanes is near the parking area.
5) The airport looks good during daytime but it really comes to life during night time.. It looks absolutely amazing and real classy when its lights are turned on.
6) The airport is 19 KM from G-13 interchange and 15 KM from 26 Number chungi. The road is very wide and newly carpeted. From 26 number to motorway bridge the metro lane is not separated via barriers from the main road. Only an orange line indicates that the inner lane is for Metro bus.
 

Pakistan Affairs Latest Posts

Back
Top Bottom